Inside the installation
Terra Dotta — Three-Screen Office Installation in Chapel Hill
Handydux installed three evenly aligned televisions at Terra Dotta’s Chapel Hill office. The project continued through outlet work, patching and paint matching, with the screens…
Handydux installed three evenly aligned televisions at Terra Dotta’s Chapel Hill office. The project continued through outlet work, patching and paint matching, with the screens removed while that work took place. After the paint dried, the desks were moved back and the televisions reinstalled. The photographs show the installation and the finished workspace across those visits.
Phase 1 — Office TV installation
Mounted three televisions at Terra Dotta’s Chapel Hill office and aligned the screens with one another.
Phase 2 — Office outlet installation
The televisions were removed while additional lower outlets were installed and tested as part of the office project.
Phase 3 — Patching, painting and TV reinstallation
Patched and painted the areas affected by the wall work. After the paint dried, the desks were returned and the televisions reinstalled with even spacing.
For a new office TV project, confirm screen mounting and cable options first. Outlet work, patching and painting need separately confirmed responsibilities and scope. Discuss commercial TV installation.
Related services
Planning work in Chapel Hill? Explore Handydux services in Chapel Hill.
Planning note: Multiple Office TVs: Agree on Alignment and Use Before Installation
Project Images
The work, in view.

Three aligned office televisions on an orange wall, unobstructed view

Wider vertical view of the three-screen installation with floor visible

Cut drywall pieces from the outlet-work phase

Exposed cable and wall openings while a TV is removed

Three office televisions above the returned desks and green dividers

Outlet tester above a wall opening during installation

Close view of outlet tester in a newly installed lower outlet

Second test view of the lower outlet on the orange wall

Open wall box and wire during outlet work

Outlet tester on the opposite colored wall

Closer outlet testing view on the opposite wall

Finished lower outlet on the orange wall with wall patches visible

Finished lower outlet plates on the opposite mural wall